J36020-1 Pre-cooler Removal and Installation Tool for GE90 Engine – Boeing 777 Aircraft Maintenance Equipment
Part Number:
J36020-1
In stock:
Not In Stock
Delivery Time:
Contact to Confirm
REMOVAL/INSTALLATION EQUIPMENT – PRECOOLER, GE90 ENGINES
Company Name: Shanghai Junxun Aviation Technology Co., Ltd.
Category
Details
Size (CM):244*122*95
Weight (KG):326
The J36020-1 is a specialized tool designed for the removal and installation of the pre-cooler on the GE90 engine installed on the Boeing 777 aircraft. This aviation maintenance tool is essential for engine servicing and overhaul operations, providing a precise and efficient method for handling the pre-cooler component during maintenance tasks.
The J36020-1 is specifically designed to ensure safe, efficient, and accurate handling of the pre-cooler during the disassembly and installation process. Its use helps maintain the integrity of both the engine and the pre-cooler, ensuring that the GE90 engine continues to operate at optimal performance levels. By improving the efficiency of the pre-cooler maintenance process, this tool reduces downtime and minimizes the risk of damage during handling.
This tool is critical for MRO facilities and aviation professionals working on the Boeing 777 aircraft, ensuring that the GE90 engine pre-cooler is serviced correctly according to manufacturer specifications.