C54011-59 REMOVAL / INSTALLATION EQUIPMENT – ENGINE STRUT
Part Number:
C54011-59
In stock:
Not In Stock
Delivery Time:
Contact to Confirm
EQUIP STRUT ENGINE
Company Name: Shanghai Junxun Aviation Technology Co., Ltd.
Category
Details
Size (CM): 132*106*49
Weight (KG): 130
Brand: Junxun
Overview:
The Junxun C54011-59 REMOVAL / INSTALLATION EQUIPMENT – ENGINE STRUT is a specialized aircraft maintenance tool designed for the safe removal, installation, alignment, and preload of the engine strut during engine and pylon maintenance operations. Specifically developed for Boeing 737 aircraft equipped with CFM56-7 engines, this equipment provides stable support and controlled positioning of the engine strut, ensuring safe maintenance procedures and accurate component alignment.
Engineered for aviation MRO applications, the equipment assists technicians in handling the engine strut while minimizing structural stress. It is also used to preload the engine strut during fuse pin removal and installation, supporting OEM-compliant maintenance procedures.
Key Points:
Specialized equipment for engine strut removal and installation
Designed for Boeing 737 CFM56-7 engine applications
Provides stable support and precise positioning of the engine strut
Assists with engine strut preload during fuse pin maintenance
Reduces risk of component misalignment and structural damage
Heavy-duty construction for repeated MRO use
Application:
Ideal for airlines, aircraft maintenance organizations, and MRO facilities performing Boeing 737 CFM56-7 engine strut maintenance, engine removal and installation, pylon servicing, and fuse pin replacement procedures. Commonly used during engine strut handling operations to ensure safe positioning, accurate alignment, and controlled preload in accordance with OEM maintenance requirements.irtightness and system reliability.